January 31, 2012

BATHROOM REMODEL PROGRESS

We have slowly, but surely been remodeling our bathroom.  I posted pictures of the tile work above the shower previously.  We removed the old sink and vanity to replace it with a  pedestal sink and new flooring over the old.  The sink change made a huge difference in opening up the space. 
While doing the floor, CEO apparently needed a little more supervision, so I called in my backup. :)
I cant wait to share completion pictures. Stay tuned.....
TJO

3 comments:

  1. Can't wait to see what you guys and Maggie have done!

    ReplyDelete
  2. Looks like your backup Supervisor is checking for cracks:)

    ReplyDelete
  3. Hi Tara! It was great connecting with you at the local foods conference! I look forward to getting to know you better and learning fun new things from the blog here!

    ReplyDelete